Responses

Please find below the responses to the Planning Application received from the statutory stakeholders and local authorities.

This list will be added to as responses are received.

Hamble Airfield Timeline

TitleSummaryLink
Updated Drainage Design – Technical Note

Lisa Kirby Hawkes – Reg 25 Response December 2023

Vol 1 Appendix 2 – Phased Restoration Rev A Part 2

Vol 1 Appendix 2 – Phased Restoration Rev A Part 1

Vol 3 – Non-Technical Summary Rev B – Agricultural Viability Report

Technical Note – Ground Movement Assessment

Technical Note – Groundwater Flow 1

Technical Note – Updated Drainage Design

Vol 1 Appendix 2 – Landscape Layout Plan Operational Phase Rev B

Vol 1 Appendix 2 – Lighting Layout Entrance & Car Park Rev A

Vol 1 Appendix 2- Lighting Layout Plant Area Rev A

Vol 1 Appendix 2 – Method of Working Scheme Rev B

Vol 1 Appendix 2 – Proposed Plant Site Layout Rev B

Vol 1 Appendix 2 – Proposed Restoration Plan Rev B

Vol 1 Appendix 2 – Proposed Site Plan Rev B

Air Quality – Second Reg 25 Response (1)

Cemex Clarification Response to EHO Noise Comments Jan23

Cemex Clarification Response to Landscape Comments Nov 23

Cemex Clarification Response to Natural England Response – Nov23

Cemex Clarification Response to RoW Nov23 (1)

Dust Management Plan (1)

Regulation 25 List of Information Submitted

Notice Reg 25 Amendments Sep23

Vol 1 – Planning Statement – Rev B

Vol 1 Appendix 3 Arboricultural Impact Assessment & Arboricultural Method Statement Rev C

Vol 1 Appendix 3 – Tree Survey Constraints & Protection Plan Rev C

Vol 1 Appendix 5 – Appendices to SCI (Redacted)

Appendix 10.1 Health Impact Assessment

Vol 2 Appendix 4.8 – Biodiversity Metric 4.0 Rev A

Vol 2 Appendix 4.9 – Habitat Condition Assessment Sheets

Vol 2 Appendix 7.3 – Supplementary Transport Note

Vol 2 Appendix 7.4 – Technical Note – Vehicle Movement Condition

Vol 2 Appendix 9.13 ALC Grades (1)

Vol 2 Appendix 9.14 – Agricultural Viability Report

Access Plan for S106 – Rev A

Vol 2 Appendix 3.2 – Outline Landscape, Restoration and Aftercare Scheme Rev B

Vol 2 Appendix 3.3 – Estimated Restoration Planting Costs Rev B

Vol 2 Appendix 4.2 – Shadow Habitat Regulations Assessment Rev B

Vol 2 Chapter 10 – Ecology Rev B

Vol 2 Chapter 13 – Transport Rev B

Vol 2 Chapter 14 – Soils Rev A

Vol 2 Chapters 1-6 – Preliminary Chapters Rev B

Vol 2 Chapters 15-20 Final Chapters Rev B

Vol 3 – Non Technical Summary Rev B

Regulation 25 Request August 2023

Letter to HCC Planning Department and Regulatory Committee – Mitigation Measures

Letter to HCC Planning Department and Regulatory Committee – Conditions

Highways Response 29 June 2023

HCC Highway Mitigations – Letter of Challenge April 2023

Arboriculture Further Response

Natural England Further Response

Independent Highway Impact Review from HPC’s Consultant, RGP

HPC Response to Hamble Airfield Application (Additional Documents)

Regulation 25 Submission List of Documents

Air Quality (Reg 25 28 November 2022)

Ecology Vol 2 Appendix 4.4 Breeding & Wintering Bird Surveys Rev A (Reg 25 28 November 2022)

Ecology Vol 2 Chapter 10 Rev A (Reg 25 28 November 2022)

Ecology Vol 2 Appendix 4.7 Reptile Surveys & Mitigation Strategy Rev A (Reg 25 28 November 2022)

Ecology Vol 2 Appendix 4.8 (NEW) BNG Calculations (Reg 25 28 November 2022)

Ecology Vol 2 Appendix 4.2 Shadow Habitat Regs Assessment Rev A (Reg 25 28 November 2022)

Hydro Reg Response to NE, Ecology and LLFA (Reg 25 28 November 2022)

Hydro Reg 25 Response to Network Rail and EA (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 Infiltration Testing Report (Exc Appendix B) (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 1 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 2 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 3 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 4 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 5 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 6 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.7 (New) Infiltration Testing Report Appendix B Part 7 (Reg 25 28 November 2022)

Hydro Vol 2 Appendix 2.6 (New) Borehole Logs (Reg 25 28 November 2022)

Hydro Reg 25 Response – Drainage and Infiltration Testing

Soils Vol 2 Chapter 14 (New) – Soils and ALC (Reg 25 28 November 2022)

Soils Appendices 9.1 (Reg 25 28 November 2022)

Soils Appendices 9.2 (New) (Reg 25 28 November 2022)

Noise Reg 25 Response (Reg 25 28 November 2022)

Noise Reg 25 Addendum updated Baseline Noise Survey (Reg 25 28 November 2022)

Archaeology Vol 2 Chapter 11 Updated Archaeology and Heritage Rev A (Reg 25 28 November 2022)

Landscape & Visual Reg 25 Addendum (Reg 25 28 November 2022)

Landscape & Restoration Vol 1 Appendix 2 Restoration Plan Rev A (Reg 25 28 November 2022)

Landscape & Restoration Vol 1 Appendix 2 (New) Aftercare & Management Areas (Reg 25 28 November 2022)

Landscape & Restoration Vol 1 Appendix 2 Landscape Layout Operational Phase RevA (Reg 25 28 November 2022)

Landscape & Restoration Vol 1 Appendix 2 (New) Phased Restoration Plan Part 1 (Reg 25 28 November 2022)

Landscape & Restoration Vol 1 Appendix 2 (New) Phased Restoration Plan Part 2 (Reg 25 28 November 2022)

Landscape & Restoration Vol 2 Appendix 3.2 Outline Landscape Restoration & Aftercare Scheme RevA (Reg 25 28 November 2022)

Landscape & Restoration Vol 2 Appendix 3.3 (New) Estimate for Planting & Restoration Costs (Reg 25 28 November 2022)

Trees CEMEX Response to Tree Officer (Reg 25 28 November 2022)

Trees Vol 1 Appendix 3 AIA & AMS Rev B (Reg 25 28 November 2022)

Trees Vol 1 Appendix 3 Tree Survey Constraints & Protection Plan RevB (Reg 25 28 November 2022)

Trees Vol 1 Appendix (New) Areas of Trees Marked as Group (Reg 25 28 November 2022)

Trees Vol 1 Appendix 3 (New) CAVAT Valuation Rev A (Reg 25 28 November 2022)

Transport Assessment Reg 25 Addendum Part 1 (Reg 25 28 November 2022)

Transport Assessment Reg 25 Addendum Part 2 (Reg 25 28 November 2022)

Transport Assessment Reg 25 Addendum Part 3 (Reg 25 28 November 2022)

Transport Vol 2 Chapter 13 Transport Rev A (Reg 25 2 December 2022)

Transport Safety Audit (Reg 25 2 December 2022)

Transport Safety Audit Plan (Reg 25 2 December 2022)

Vol 1 Appendix 2 Method of Working Scheme RevA Part 1 (Reg 25 28 November 2022)

Vol 1 Appendix 2 Method of Working Scheme RevA Part 2 (Reg 25 28 November 2022)

Vol 1 Appendix 2 Proposed Plant Site Layout Plan RevA (Reg 25 28 November 2022)

Vol 1 Appendix 2 Proposed Site Plan RevA (Reg 25 28 November 2022)

Vol 1 Planning Statement (Reg 25 2 December 2022)

Vol 2 chapter 1 – 6 RevA (Reg 25 2 December 2022)

Vol 2 Chapter 15-20 Rev A (Reg 25 2 December 2022)

Vol 3 Non Technical Summary (Reg 25 2 December 2022)

Draft Heads of Terms for S106 (Reg 25 28 November 2022)

Access Plan For S106 (Reg 25 2 December 2022)

CEMEX Response to Parish Council Concerns (Reg 25 2 December 2022)

HCC Minerals & Waste Review – FAQs, Nov22

HMWP – Draft Plan Consultation Paper – Nov22

HMWP – Partial Update – Aggregate Recycling Topic Paper August 2022

HMWP – Partial Update – Climate Change Topic Paper August 2022

HMWP – Partial Update – Equalities Impact Assessment August 2022

HMWP – Partial Update – Heritage Statement August 2022

HMWP – Partial Update – Revised Baseline and Methodology Report September 2021

HMWP – Partial Update – HRA Screening Report August 2022

HMWP – Partial Update – Minerals and Waste Site Proposal Study August 2022

HMWP – Partial Update – Minerals Background Study August 2022

HMWP – Partial Update – SA Revised Baseline Report September 2021

HMWP – Partial Update – SA Revised Scoping Report September 2021

HMWP – Partial Update – Site Restoration Topic Paper August 2022

HMWP – Partial Update – Waste Background Study August 2022

HMWP – Partial Update – Wharves and Rail Depots Topic Paper August 2022

HMWP – Partial Update – Whitehill & Bordon Safeguarding Topic Paper August 2022

HMWP – Partial Update – Duty to Co-operate Statement August 2022

HMWP – Partial Update – Ecological Statement August 2022

Draft Plan Consultation FAQs – Nov22

Notice of Draft Plan Consultation – Nov22

Hampshire Minerals and Waste Plan – Partial Update – Draft Plan Document – Nov22

HMWP – Partial Update – SA-SEA Interim Report August 2022

HMWP – Partial Update – Strategic Flood Risk Assessment Statement August 2022

HMWP – Partial Update – Strategic Landscape and Visual Assessment August 2022

HMWP – Partial Update – Transport Assessment August 2022

HCC – Update to Regulation 25 Notice, August 2022

HCC – Regulation 25 Notice, April 2022

Natural England – Response to Hamble Airfield Planning Application, Mar 2022

National Highways – Response to Hamble Airfield Planning Application, Feb 2022

HCC’s Flood & Water Management Team – Response to Hamble Airfield Planning Application, Feb 2022

HCC’s Landscape Planning Team – Response to Hamble Airfield Planning Application, Feb 2022

Hound Parish Council – Response to Hamble Airfield Planning Application, March 2022

Environment Agency – Response to Hamble Airfield Planning Application, February 2022

HCC’s Ecology Team – Response to Hamble Airfield Planning Application, February 2022

Defence Infrastructure Organisation – Response to Hamble Airfield Planning Application, Jan 2022

Bursledon Parish Council – Response to Hamble Airfield Planning Application, March 2022

HCC’s Archaeology Team – Response to Hamble Airfield Planning Application, February 2022

HCC’s Arboriculture Team – Response to Hamble Airfield Planning Application, February 2022

HCC’s Highways Development Planning Response to Hamble Airfield Planning Application, March 2022

HCC’s Rights of Way Team’s Response to Hamble Airfield Planning Application, March 2022

Hamble Parish Council Response to Hamble Airfield Planning Application, March 2022

Network Rail Response to Hamble Airfield Planning Application, March 2022

Paul Holmes MP – Letter of Objection, February 2022

Eastleigh Borough Council: Response to Cemex Planning Application, Feb 2022

24: Environmental statement – Non Technical Summary

25: Environmental statement Appendix 8.4 Detailed Unexploded Ordnance Risk Assessment

26: Environmental statement Appendix 8.3 Gas Pipeline Plan

27: Environmental statement Appendix 8.2 Exolum Pipeline

28: Environmental statement Appendix 8.1 Esso Pipeline

29: Environmental statement Appendix 7.1 Transport Assessment Part 2

30: Environmental statement Appendix 7.1 Transport Assessment Part 1

31: Environmental statement Appendix 6.1 & 6.2 Air Quality

32: Environmental statement Appendix 5.1 Archaeological Desk Based Assessment

33: Environmental statement Appendix 4.7 Reptile Surveys and Mitigation Strategy

34: Environmental statement Appendix 4.6 Invertebrate Survey

35: Environmental statement Appendix 4.5 Hazel Dormouse Surveys

36: Environmental statement Appendix 4.4 Breeding & Wintering Bird Surveys

37: Environmental statement Appendix 4.3 Bat Surveys

38: Environmental statement Appendix 4.2 Habitats Regulations Assessment

39: Environmental statement Appendix 4.1 Ecological Appraisal & Desk Study

40: Environmental statement Appendix 3.2 Landscaping Restoration and outline Five year Aftercase Scheme

41: Environmental statement Appendix 3.1 Visual Elements

42: Environmental statement Appendix 2.5 Ground Condition Assessment Part 2

43: Environmental statement Appendix 2.5 Ground Condition Assessment Part 1

44: Environmental statement Appendix 2.4 Saturated Thickness Chart

45: Environmental statement Appendix 2.3 Estimation of Hydraulic Conductivity

46: Environmental statement Appendix 2.2 Flood Risk Assessment

47: Environmental statement Appendix 2.1 Borehole Logs

48: Environmental statement Appendices 1.1-1.6 Noise

49: Environmental statement Chapter 14-18 Final Chapters

50: Environmental statement Chapter 13 Transport

51: Environmental statement Chapter 12 Air Quality

52: Environmental statement Chapter 11 Archaeology & Culture Heritage

53: Environmental statement Chapter 10 Ecology

54: Environmental statement Chapter 9 Photosheet 7-8 Oct 2021

55: Environmental statement Chapter 9 photsheet 5-6 Oct 2021

56: Environmental statement Chapter 9 Photosheet 3-4 Oct 2021

57: Environmental statement Chapter 9 photosheets 1-2 Oct 2021

58: Environmental statement Chapter 9 Figure 2C

59: Environmental statement Chapter 9 Figure 2B

60: Environmental statement Chapter 9 Figure 2A

61: Environmental statement Chapter 9 Figure 1D

62: Environmental statement Chapter 9 Figure 1C

63: Environmental statement Chapter 9 Figure 1B

64: Environmental statement Chapter 9 Figure 1A

65: Environmental statement Chapter 9 Landscape and Visual Impact Assessment

66: Environmental statement Chapter 8 Water Environment & Flood Risk

67: Environmental statement Chapter 7 Noise

68: Environmental statement Chapters 1-6 Preliminary Chapters

1: Statement of community involvement

2: Geological Report

3: Tree Survey Constraints & Protection Plan

4: Arboricultural Impact Assessment & Arboricultural Method Statement

5: Concept Restoration Plan (21-08-HAMB-1717-P1-REST)

6: Site Plan (TD21030RevL Sheet 1 of 3)

7: Plant Site Area (TD21030RevL Sheet 2 of 3)

8: Elevations(TD21030 Rev L sheet 3 of 3)

9: Method of working Phase 6 (5 Plans)

10: Method of Working Phasing Overview (6 Plans)

11: LVIA & Restoration Sections (LVIA2C)

12: Lighting Layout – Haul Road Car Park & Weighbridge (TD21045 Sheet 1 of 2 Rev B)

13: Lighting Layout – Aggregate Processing Plant (TD 21045Rev B Sheet 2 of 2)

14: Landscape Layout Plan (Operational Phase) (21-08-HAMB-1717-P1-LAND)

15: Landscape Detail Sections (Operational Phase) (21-08-HAMB-1717-P1-LAND-SECT)

16: Timber Posts & Stockproof Wire Fence (L/FE/02)

17: The location plan (21-10/P1/HMBL/1)

18: Planning statement

19: Application Form

20: Minerals Application Form

21: Notice

Eastleigh Surface Water Management Plan

The document describes the topography, geology and hydrology of Eastleigh borough and describes other significant …

Hampshire Mineral & Waste Plan – Inspectors Report

This report contains the Inspector’s assessment of the Hampshire Minerals and Waste Local Plan in …

Hampshire Statement of Community Involvement

This guide is for elected members, local communities, other local planning authorities, developers and other …

Hampshire Minerals Plan Traffic Assessment

Traffic and Highway Access Assessment of the locations identified for consideration as part of the …

Submission of Minerals and Waste Planning Applications

Guidance from Hampshire County Council for the submission of planning applications in …

22: Consultation Documents: Restoration Proposals

Outlining the ecology and restoration plans for the site …

23: Consultation Documents: Summary of Excavation Proposals

Summary of Cemex’s proposals in respect of the excavation of the former Hamble Airfield site.  …

National Policy Planning Framework

This extract from the National Policy Planning Framework sets out the Government’s policy in respect …

RAGE – Final Report (Jun 2008)

The Final Report of the Independent Review of Proposed Hampshire County Council Minerals Allocations in …

Residents Against Gravel Extraction (RAGE) – Executive Summary (Jun 2008)

An independent review of the proposed Hampshire County Council Minerals Allocations in South …

Cemex Documents

Ask a
Question

Pre 2013 Evidence, Studies & Plan

Mineral & Waste Authority (Hants CC)